Формализация пространства управления проектами

Ескіз

Дата

2016

ORCID

DOI

item.page.thesis.degree.name

item.page.thesis.degree.level

item.page.thesis.degree.discipline

item.page.thesis.degree.department

item.page.thesis.degree.grantor

item.page.thesis.degree.advisor

item.page.thesis.degree.committeeMember

Назва журналу

Номер ISSN

Назва тому

Видавець

НТУ "ХПИ"

Анотація

Для эффективного применения физических аналогий при оптимизации непредвиденных ресурсных потоков в проектной среде, возникающих, например, при реализации рисковых событий, необходимо наличие адекватной дискретной адаптивной модели пространства управления проектами. Предложено построение такой модели с помощью виртуальных элементов с переменной проницаемостью и емкостью. Модель реализована при строительстве энергосооружений с положительным техническим эффектом.
For the effective use of physical analogies in the optimization of emergency resource flows in the project environment, arising, for example, the implementation of risk events must have an adequate discrete adaptive model of space project management. The proposed building such a model using virtual elements with variable permeability and capacity. Project management like any other strategic process is subject to careful planning to ensure the effective implementation of all the work under the proje ct within the specified timeframe. Unfortunately, the project activity does not develop "according to plan", responding thus to the many risk events that occur under the influence of the turbulent environment. The vitality of a project is reduced, until the complete stop of the project. In this respect, project management should respond to risk events quickly, frequently, in the case of force majeure, no time for a thorough analysis of the situation and adoption of effective solutions to eliminate the effects of planned and, especia lly, the "surprise" of risk events. The analysis of methods and means of project management processes and programs formalized the concept of "adaptive discrete environment project activities" in the form of a hypercube in eleven space -time, defined the elements of the environment and their properties. The developed method of on-line geometrical adaptation of the structure of the elements of the environment to the real needs of the optimization processes, with the Express design of logistics flows, aimed at minimizing losses during the realization of risk events. Tests in Corporation "UNION" showed: the project execution period is reduced by 11 %; the cost of implementation of the project was reduced to 1.25 %; the amount of risk, which managed to be prevented – 17 %.

Опис

Ключові слова

проектные риски, ресурсные потоки, физические аналогии, проектная среда, строительство энергосооружений, project risks, resource flow, physical analogy, model of space project management

Бібліографічний опис

Формализация пространства управления проектами / О. С. Савельева [и др.] // Вісник Нац. техн. ун-ту "ХПІ" : зб. наук. пр. Сер. : Нові рішення в сучасних технологіях = Bulletin of National Technical University "KhPI" : coll. of sci. papers. Ser. : New solutions in modern technologies. – Харків : НТУ "ХПІ", 2016. – № 42 (1214). – С. 154-159.