Methods of Choosing an Optimal Portfolio of Projects

Ескіз

Дата

2016

ORCID

DOI

item.page.thesis.degree.name

item.page.thesis.degree.level

item.page.thesis.degree.discipline

item.page.thesis.degree.department

item.page.thesis.degree.grantor

item.page.thesis.degree.advisor

item.page.thesis.degree.committeeMember

Назва журналу

Номер ISSN

Назва тому

Видавець

University of Miskolc

Анотація

This paper presents an analysis of existing methods for a portfolio of project optimization. The necessity for their improvement is shown. It is suggested to assess the portfolio of projects on the basis of the amount in the difference between the results and costs during development and implementation of selected projects and the losses caused by non-implementation or delayed implementation of projects that were not included in the portfolio. Consideration of capital and current costs components are required for the portfolio of projects efficiency calculation. An optimization model for a portfolio of projects is developed. Consideration of social and economic factors that contribute the integral assessment of the portfolio of project and methods for their calculation are proposed.

Опис

Ключові слова

project, portfolio, economic evaluation, reallocation of resources, interim results, comprehensive studies, probabilistic factors

Бібліографічний опис

Yakovlev A. Methods of Choosing an Optimal Portfolio of Projects / A. Yakovlev, M. Chernenko // 'Club of Economics in Miskolc' TMP. – 2016. – Vol. 12, № 2. – P. 33-38.

item.page.endorsement

item.page.review

item.page.supplemented

item.page.referenced