Under the re-engineering of building structures understand the processes of adjustment or completion, in which the
deviation from the initial drawing facilities with the addition of new elements, and the creation of manufacturing technology of the
past. The aim of this work was to improve the effectiveness of project management of re-engineering construction by reducing time
and cost of design works, as well as improving the product quality of the project through the development and implementation of
support systems for design decision making in the planning stages of content projects, and response to project risks. Developed a
system of "REBUS" support of design decisions in the re-engineering of building structures. Tested system "REBUS" in the
framework of project management reengineering of an industrial facility with a positive technical effect. Tests have shown that the
use of "REBUS" has achieved the following technical and economic results: with respect to the interaction with the turbulent
environment: developed standards of operations of the management of the project as a response to changes in planned early in the
project functional areas of project activities; in respect of the project management process: • reduced installation costs 1.3 times; •
reduced the term of the lease of warehouse space by 18 %; • increased speed of information processing in the logistics Department 7
%; – in terms of the product of the project: • insolation is the most darkened areas of the room increased by almost 40 %; total costs
for heating of the object decreased to 26.6 % while maintaining the average temperature in the premises;• the amount of carbon
monoxide (CO2) in the air in the internal volume of construction decreased by 27.1 %.
Description
Citation
Управління ризиками-сюрпризами в проектах реінжинірингу будівельних споруд / О. Л. Становський [та ін.] // Вісник Нац. техн. ун-ту "ХПІ" : зб. наук. пр. Сер. : Нові рішення в сучасних технологіях = Bulletin of National Technical University "KhPI" : coll. works. Ser. : New solutions in modern technologies. – Харків : НТУ "ХПІ", 2017. – № 7 (1229). – С. 103-109.