Mathematical Models and Minimization Methods of Works Time and Costs on the Project

Ескіз

Дата

2008

ORCID

DOI

item.page.thesis.degree.name

item.page.thesis.degree.level

item.page.thesis.degree.discipline

item.page.thesis.degree.department

item.page.thesis.degree.grantor

item.page.thesis.degree.advisor

item.page.thesis.degree.committeeMember

Назва журналу

Номер ISSN

Назва тому

Видавець

Анотація

There is a wide class of planning tasks in which possible technologies of works execution and their combinations can be succeeded by the alternative variants. These variants can be represented as network models. The dependence between scope, time and cost of works execution are discrete. The goal of work is to creat effective methods for these tasks solution. The mathematical models and minimization method of project execution time on the project with possible funding constrains during different periods and with given alternative variants of the network models fragments are offered in this paper. For project cost minimization problems solution the mathematical model and minimization method of project works costs with project works execution terms constraints and given alternative variants of the network models fragments are offered

Опис

Ключові слова

network models optimization, time, cost, project, mathematical models

Бібліографічний опис

Kononenko I. Mathematical Models and Minimization Methods of Works Time and Costs on the Project / I. Kononenko, O. Iemelianova, A. Mochenkov // The 22th International Project Management Association World Congress, 9-11 November 2008. – Rome, Italy. – 2008. – 5 pp.

item.page.endorsement

item.page.review

item.page.supplemented

item.page.referenced