Project scope optimization model and method on criteria profit, time, cost, quality, risk. Integrating Project Management Standards

dc.contributor.authorKononenko, Igoren
dc.contributor.authorFadeyev, Valeriyen
dc.contributor.authorKolisnyk, Mariiaen
dc.date.accessioned2013-12-20T12:28:16Z
dc.date.available2013-12-20T12:28:16Z
dc.date.issued2012
dc.description.abstractThe paper presents a mathematical model of the structural optimization of the project scope, which includes five objective functions. One of the functions reflects the profit for the entire project life cycle. The others reflect the time of its realization, the cost of the project, the value of the generalized indicator of project product quality and the risk assessment associated with the project. The model takes into account the restrictions on the lack of financial debt after each phase completion, the duration of the project, the quality of the separate stages products. It is assumed that the project scope is given in the form of a network model with the alternatives of the work execution. The suggested model is a multi-objective, dynamic, containing Boolean variables, algorithmic and analytical objective functions and constraints. A method of multi-objective structural optimization of the project scope with constraints was proposed to solve the problem.en
dc.identifier.citationKononenko I. Project scope optimization model and method on criteria profit, time, cost, quality, risk. Integrating Project Management Standards / I. Kononenko, V. Fadeyev, M. Kolisnyk // Proceedings of the 26th IPMA World congress, 29-31 October 2012. – Hersonissos, Crete, Greece, 2012. – p. 286-292.en
dc.identifier.urihttps://repository.kpi.kharkov.ua/handle/KhPI-Press/3317en
dc.language.isoen
dc.publisherElsevier Ltd.en
dc.subjectprojecten
dc.subjectscopeen
dc.subjectmulty-objective optimizationen
dc.subjectnetwork modelen
dc.subjectdynamic problemen
dc.titleProject scope optimization model and method on criteria profit, time, cost, quality, risk. Integrating Project Management Standardsen
dc.typeArticleen

Файли

Контейнер файлів

Зараз показуємо 1 - 1 з 1
Ескіз
Назва:
Kononenko_2012_Project scope optimization.pdf
Розмір:
518.39 KB
Формат:
Adobe Portable Document Format

Ліцензійна угода

Зараз показуємо 1 - 1 з 1
Ескіз недоступний
Назва:
license.txt
Розмір:
6.73 KB
Формат:
Item-specific license agreed upon to submission
Опис: